Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2019, 04:40 PM
  • 05 0456A_05 0456_7252019_113109.mp4

Date
07/25/2019
W/O
0782137
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00526
PipeID
P05671
Time
9:40 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8037
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Capital Improvement Program Assesment
Project
20190725MI_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
05 0456
Downstream MH
05 0456A
Dir. of Survey
Upstream
Length Surveyed
304.4 ft.
Total Length
304.4 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
10
Pipe schematic from manhole 05 0456 to 05 0456A
MH: 05 0456MH: 05 0456Aupstream0 ft. MGO - General Observation - ROACHES >50 AT MH0 ft. AMH - Upstream Manhole, Survey Ends - 12:06 PM0 ft. MGO - General Observation - BULKHEAD AT THE MH2.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - GREASE/RAGS2.7 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish34.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE/RAGGS39.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open41 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"64.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"89.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open91.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open141.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open143.6 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"191.3 ft. TFD - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: NO, 4" - 10 %ROOTS/RAGGS193.6 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"240.5 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 4"243.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"290.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start292.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"294.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"294.6 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES296.3 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start304.4 ft. MWM - Water Mark, 20 %of cross sectional area304.4 ft. MGO - General Observation - ROACHES >50304.4 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK, ACTIVE304.4 ft. MWL - Water Level, 5 %of cross sectional area304.4 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE304.4 ft. AMH - Downstream Manhole, Survey Begins - 11:45AM

Observation photos (8)

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    9.8 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    13.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: NO, 4" - 10 %ROOTS/RAGGS

    113.1 ft. - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: NO, 4" - 10 %ROOTS/RAGGS

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"

    240 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - GREASE/RAGGS

    270 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE/RAGGS

  • Upstream Manhole, Survey Ends - 12:06 PM

    304.4 ft. - Upstream Manhole, Survey Ends - 12:06 PM

  • General Observation - BULKHEAD AT THE MH

    304.4 ft. - General Observation - BULKHEAD AT THE MH

Observations (29)

DistanceCodeObservation
12.3TF
8.1SSS
113.1TFD10 %ROOTS/RAGGS
263.4TFA
270DSZGREASE/RAGGS
0MWM
240TBA
13.8DAGS
63.9TFA
0MGOROACHES >50
9.8TF
213.2TFOpen
264.7TFOpen
301.7DSZGREASE/RAGS
163TFOpen
0MGOCONNECTION AT MH, 3 OCLOCK, ACTIVE
0MWL
301.7SSS
110.8TFA
0MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
215TFOpen
0AMH11:45AM
301.7DAGS
61.3TFA
304.4MGOROACHES >50 AT MH
304.4AMH12:06 PM
304.4MGOBULKHEAD AT THE MH
160.8TFA
9.8CL

Properties (6)

additional_info
RFIR INSPECTION ONLY
custom_field_two
3
customer
LACSD
datetime
2019-07-25T09:40:28-07:00
documentation
IGNACIO, FRANKLIN, CASTILLO
is_lateral_inspection
false