18 0024_18 0023 _09072019_035112.mp4

0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

0 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
25.6 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
139.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 167.1 | MGO | INK PIPE REAPIR END |
| 0 | MGO | — |
| 164.1 | MGO | LINK PIPE REPAIR START |
| 0 | DAGS | — |
| 167.5 | SAP | — |
| 167 | DAGS | — |
| 0 | MGO | SERVICE CONNECTION AT 3 O'CLOCK AT MH |
| 3.8 | SAP | — |
| 0 | MGO | LINK PIPE REPAIR |
| 0 | MWM | — |
| 0 | MWL | — |
| 25.6 | CM | — |
| 167 | SSS | — |
| 0 | AMH | 18 0023 |
| 139.5 | FM | — |
| 167.5 | FM | — |
| 167 | CM | — |
| 167.5 | MSA | REVERSAL COMPLETED |
| 0 | SSS | — |