18 0032_18 0031 _09072019_000057.mp4

2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
2.3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
80.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
249.5 ft. - Fracture Multiple, from 01 to 03 o'clock, within 8 inches of joint: YES
307.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 2.3 | SAP | — |
| 249.5 | FM | — |
| 80.9 | FM | — |
| 2 | SSS | — |
| 2.3 | MGO | MAGNEZIUM H.O COATING |
| 0 | MWL | — |
| 2 | DAGS | — |
| 91.2 | TF | — |
| 307.7 | FM | — |
| 0 | AMH | 18 0032 |
| 44.6 | TFC | — |
| 321 | DAGS | — |
| 319.2 | SAP | — |
| 321.7 | AMH | 18 0031 |
| 321 | FM | — |
| 321.7 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 321 | SSS | — |
| 0 | MWM | — |