18 0031_18 0030 _09072019_002216.mp4

1.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
2.3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

16.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
105.5 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
273.5 ft. - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 0 | MWL | — |
| 2.3 | MGO | MAGNEZIUM H.O COATING start |
| 278 | CM | — |
| 278.9 | AMH | 18 0030 |
| 278 | DAGS | — |
| 105.5 | CM | — |
| 278 | SSS | — |
| 0 | MWM | — |
| 278.9 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 273.5 | FS | — |
| 2 | DAGS | — |
| 278 | DAE | — |
| 0 | AMH | 18 0031 |
| 16.1 | DAE | — |
| 1.1 | SSS | — |
| 2.3 | SAP | — |
| 276.5 | SAP | — |
| 259.4 | TFC | — |