18 0029_18 0028 _09072019_024000.mp4

2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

17 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start
45 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 2.1 | DAGS | — |
| 99 | CM | — |
| 97.2 | SAP | — |
| 99 | AMH | 18 0029 |
| 0 | MWM | — |
| 99 | DAE | — |
| 99 | DAGS | — |
| 99 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 2.6 | SAP | — |
| 99 | SSS | — |
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 17 | DAE | — |
| 0 | MWL | — |
| 2.6 | MGO | MAGNEZIUM H.O COATING start |
| 45 | CM | — |
| 2.1 | SSS | — |
| 0 | AMH | 18 0028 |