18 0025_18 0024 _09072019_020237.mp4

0 ft. - Downstream Manhole, Survey Begins - 18 0024

1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.5 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
4.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
29 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES
41.2 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 59.5 | SAP | — |
| 0 | SSS | — |
| 61.3 | CM | — |
| 29 | FL | — |
| 61.5 | AMH | 18 0025 |
| 1 | DAGS | — |
| 4.9 | CM | — |
| 59.5 | FM | — |
| 3.5 | SAP | — |
| 3.5 | MGO | MAGNEZIUM H.O COATING |
| 61 | SSS | — |
| 0 | AMH | 18 0024 |
| 61.5 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 61 | DAGS | — |
| 0 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 41.2 | FM | — |
| 0 | MWM | — |
| 0 | MWL | — |