Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 11, 2019, 07:42 AM
  • 20 0431_20 0430 _11072019_005635.mp4

Date
07/11/2019
W/O
772198
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00749
PipeID
P19379
Time
12:42 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6631
Sewer Name
20 10TH STREET EAST CONNECTION TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_772198_TV20064_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
20 0431
Downstream MH
20 0430
Dir. of Survey
Downstream
Length Surveyed
233.9 ft.
Total Length
233.9 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
94
Pipe schematic from manhole 20 0431 to 20 0430
MH: 20 0431MH: 20 0430downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 04310 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES17.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"48.7 ft. MGO - General Observation - UNMAPPED MH50 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK56.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish233.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE233.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0430233.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    7 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

    50 ft. - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

  • General Observation - COCKROACHES IN MANHOLE

    233.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
233.9MGOCOCKROACHES IN MANHOLE
233.9AMH20 0430
0AMH20 0431
0MGOCOCKROACHES IN MANHOLE
231.5DAGS
131.9TF
7CS
2DAGS
44.9TF
0MWM
98.8TF
0MWL
159.1TFA
50MGOACTIVE CONNECTION AT MH 9 O'CLOCK
17.3TF
233.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
48.7MGOUNMAPPED MH
56.7TFC

Properties (6)

additional_info
SC378198
custom_field_two
3
customer
LACSD
datetime
2019-07-11T00:42:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false