2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
3.8 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR
36 ft. - Material Change, Vitrified clay pipe
54.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
54.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
54.5 ft. - Material Change, Concrete pipe (non-reinfored)
94.8 ft. - Roots Fine Barrell, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 268.7 | SAP | — |
| 268.7 | RFB | — |
| 2 | DAGS | — |
| 2 | SAP | — |
| 36 | SAP | — |
| 0 | MWM | — |
| 0 | AMH | B 1282 |
| 224 | MGO | POSSIBLE HOLE / SOIL OBSERVED @ 2 O'CLOCK |
| 268.7 | SSS | — |
| 54.5 | SSS | — |
| 36 | MMC | — |
| 268.7 | DAGS | — |
| 2 | SSS | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 3 O'CLOCK |
| 270.6 | AMH | B 1281 |
| 36 | SSS | — |
| 94.8 | RFB | — |
| 0 | MWL | — |
| 3.8 | RFJ | — |
| 54.5 | SAP | — |
| 54.5 | MMC | — |