Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 1, 2019, 12:23 PM
  • 02 1386_H JOINT _01072019_052850.mp4

Date
07/01/2019
W/O
772333
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00242
PipeID
P25322
Time
5:23 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5581
Sewer Name
02 CLOVERLAWN TRUNK
City
PARAMOUNT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
31
Purpose
Routine Assessment
Project
WO_772333_TV02041_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1386
Downstream MH
H JOINT
Dir. of Survey
Downstream
Length Surveyed
10.3 ft.
Total Length
10.3 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 02 1386 to H JOINT
MH: 02 1386MH: H JOINTdownstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 13860 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area4.1 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start4.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start4.9 ft. MMC - Material Change, Cast Iron - TO CIP10.3 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish10.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish10.3 ft. MSA - Survey Abandoned - SCALE10.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    4.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Material Change, Cast Iron - TO CIP

    4.9 ft. - Material Change, Cast Iron - TO CIP

Observations (11)

DistanceCodeObservation
10.3SSS
4.6DAGS
10.3DAGS
4.9MMCTO CIP
4.1SSS
0AMH02 1386
0MWM
10.3MSASCALE
4.6DAE
0MWL
10.3DAE

Properties (7)

additional_info
SC378253
custom_field_two
5
customer
LACSD
datetime
2019-07-01T05:23:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
38576