Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 2, 2019, 07:53 AM
  • 14 0401A_14 0401 _02072019_005945.mp4

Date
07/02/2019
W/O
771919
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18484
Time
12:53 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6623
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_771919_TV14025_JUN2019_1
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401A
Downstream MH
14 0401
Dir. of Survey
Downstream
Length Surveyed
83.3 ft.
Total Length
83.3 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
78
O&M Index
2
O&M Quick
412B
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
114
Pipe schematic from manhole 14 0401A to 14 0401
MH: 14 0401AMH: 14 0401downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0401A0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start24 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"47.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish80.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish80.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish83.3 ft. AMH - Downstream Manhole, Survey Ends - 14 040183.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
80.4SSS
83.3AMH14 0401
0MWM
0AMH14 0401A
3.5SSS
83.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
80.4SAP
24TFC
72.6TFC
0MWL
2SAP
47.7TFC
80.4DAGS
2DAGS

Properties (6)

additional_info
SC378189
custom_field_two
2
customer
LACSD
datetime
2019-07-02T00:53:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false