Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 9, 2019, 06:32 AM
  • 14 0396A_14 0396 _08072019_233802.mp4

Date
07/08/2019
W/O
771919
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18478
Time
11:32 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6627
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_771919_TV14025_JUN2019_1
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0396A
Downstream MH
14 0396
Dir. of Survey
Downstream
Length Surveyed
48.7 ft.
Total Length
48.7 ft.
Structural Index
3
Structural Quick
3929
Structural Rating
45
O&M Index
2
O&M Quick
4129
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
67
Pipe schematic from manhole 14 0396A to 14 0396
MH: 14 0396AMH: 14 0396downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0396A0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish46.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish46.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish48.1 ft. MGO - General Observation - CONNECTION IN MH AT 9'048.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0396

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2SAP
48.7AMH14 0396
46.8DAGS
2SSS
3.5TFC
46.8SAP
27.2TFC
0MWL
48.1MGOCONNECTION IN MH AT 9'0
46.8SSS
0MWM
2DAGS
0AMH14 0396A
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC378193
custom_field_two
2
customer
LACSD
datetime
2019-07-08T23:32:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false