Wastewater/Activity/PacpInspection/1.0Jul 9, 2019, 08:44 AM
  • 14 0392A_14 0392 _09072019_015102.mp4

Date
07/09/2019
W/O
771919
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18473
Time
1:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6627
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_771919_TV14025_JUN2019_1
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0392A
Downstream MH
14 0392
Dir. of Survey
Downstream
Length Surveyed
32.2 ft.
Total Length
32.2 ft.
Structural Index
3
Structural Quick
3626
Structural Rating
30
O&M Index
2
O&M Quick
4126
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
46
Pipe schematic from manhole 14 0392A to 14 0392
MH: 14 0392AMH: 14 0392downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0392A0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"10.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"15.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"30.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish32.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK32.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0392

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
30.5SSS
0MWM
32.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
15.7TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
6.8TFC
0MWL
2SAP
30.5SAP
0AMH14 0392A
2SSS
0MGOCOCKROACHES IN MANHOLE
32.2AMH14 0392
10.8TFC
30.5DAGS
2DAGS

Properties (6)

additional_info
SC378193
custom_field_two
2
customer
LACSD
datetime
2019-07-09T01:44:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false