Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2019, 06:20 AM
  • 14 0382_14 0381A _24062019_233007.mp4

Date
06/24/2019
W/O
771919
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18462
Time
11:20 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6616
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_771919_TV14025_JUN2019_1
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0382
Downstream MH
14 0381A
Dir. of Survey
Downstream
Length Surveyed
202.1 ft.
Total Length
202.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
412G
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
284
Pipe schematic from manhole 14 0382 to 14 0381A
MH: 14 0382MH: 14 0381Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 03820 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"47.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"151.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"199.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish200 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish200 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish202.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK202.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0381A

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
151.7TFC
27.2TFC
99.5TFC
0AMH14 0382
123.4TFC
2DAGS
200SSS
199.6TFC
0MWL
202.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
200DAGS
175.8TFC
75.3TFC
2SSS
47.6TFC
200SAP
202.1AMH14 0381A
0MWM
2SAP

Properties (6)

additional_info
SC378182
custom_field_two
2
customer
LACSD
datetime
2019-06-24T23:20:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false