Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2019, 08:21 AM
  • 14 0380_14 0379 _28062019_013422.mp4

Date
06/28/2019
W/O
771919
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18459
Time
1:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6620
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_771919_TV14025_JUN2019_1
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0380
Downstream MH
14 0379
Dir. of Survey
Downstream
Length Surveyed
365.2 ft.
Total Length
365.2 ft.
Structural Index
2
Structural Quick
322N
Structural Rating
152
O&M Index
2
O&M Quick
412N
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
302
Pipe schematic from manhole 14 0380 to 14 0379
MH: 14 0380MH: 14 0379downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 03800 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start36.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"217 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"245 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308 ft. MWL - Water Level, 40 %of cross sectional area329.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"339.1 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area352.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"364 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish364 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish364 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish364 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish365.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0379365.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Water Level, 40 %of cross sectional area

    308 ft. - Water Level, 40 %of cross sectional area

  • Water Level, Sag in pipe, 20 %of cross sectional area

    339.1 ft. - Water Level, Sag in pipe, 20 %of cross sectional area

Observations (22)

DistanceCodeObservation
308MWL
36.2TFC
177.6TBA
245TFC
365.2AMH14 0379
329.3TFA
339.1MWLS
2DAGS
0MWM
364SSS
2SAP
60.2TFC
217TB
2SSS
364SAP
365.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
364DAGS
0AMH14 0380
162.7TFC
0MWL
352.6TFC
364DAGS

Properties (6)

additional_info
SC378186
custom_field_two
2
customer
LACSD
datetime
2019-06-28T01:21:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false