Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 2, 2019, 05:44 AM
  • 20 0291_20 0290 _01072019_225305.mp4

Date
07/01/2019
W/O
771940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P19257
Time
10:44 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6622
Sewer Name
20 20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_771940_TV20025_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0291
Downstream MH
20 0290
Dir. of Survey
Downstream
Length Surveyed
196.7 ft.
Total Length
196.7 ft.
Structural Index
2
Structural Quick
3G2N
Structural Rating
266
O&M Index
2
O&M Quick
312G
O&M Rating
81
Overall Index
2
Overall Quick
Overall Rating
347
Pipe schematic from manhole 20 0291 to 20 0290
MH: 20 0291MH: 20 0290downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 20 02910 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.9 ft. RML - Roots Medium Lateral, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YES - 5% ROOTS99.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN183.7 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 15% GRASE/OPEN187.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN194 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG194.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish196.7 ft. AMH - Downstream Manhole, Survey Ends - 20 0290

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Lateral, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YES - 5% ROOTS

    66.9 ft. - Roots Medium Lateral, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YES - 5% ROOTS

Observations (20)

DistanceCodeObservation
66.9TFA
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
66.9RML5% ROOTS
194SSS
0AMH20 0291
194SSS65% MAG
196.7AMH20 0290
0MWL
2SSS
123.2TFOPEN
183.7TFD15% GRASE/OPEN
2DAGS
194.5SAP
187.7TFOPEN
10.3TFA
194.5DAGS
2SSS65% MAG
99.7TFC
2SAP
0MWM

Properties (6)

additional_info
SC378188
custom_field_two
2
customer
LACSD
datetime
2019-07-01T22:44:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false