Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 26, 2019, 05:54 AM
  • 20 0285A_20 0285 _25062019_230308.mp4

Date
06/25/2019
W/O
771940
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00751
PipeID
P19252
Time
10:54 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6617
Sewer Name
20 20TH STREET EAST RELIEF TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_771940_TV20025_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0285A
Downstream MH
20 0285
Dir. of Survey
Downstream
Length Surveyed
208.2 ft.
Total Length
208.2 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole 20 0285A to 20 0285
MH: 20 0285AMH: 20 0285downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 0285A0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start19.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"43.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"191.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish206.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish207 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 30% MAG207 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0285208.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    208.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (23)

DistanceCodeObservation
191.7TFC
208.2AMH20 0285
67.9TFC
208.2MGOCOCKROACHES IN MANHOLE
0MWL
0AMH20 0285A
2SZ30% MAG
2SAP
0MWM
2SSS
142.8TFC
2DAGS
19.1TFC
167.5TFC
118.9TFC
43.1TFC
206.2DAGS
90.8TF
207SZ30% MAG
0MGOCOCKROACHES IN MANHOLE
207SSS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
206.2SAP

Properties (6)

additional_info
SC378183
custom_field_two
2
customer
LACSD
datetime
2019-06-25T22:54:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false