Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 2, 2019, 10:42 AM
  • 01 0276_01 0243_02072019_040814.mp4

Date
07/02/2019
W/O
771797
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00219
PipeID
P01324
Time
3:42 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5580
Sewer Name
01 STANFORD AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_771797_TV01062_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0243
Downstream MH
01 0276
Dir. of Survey
Upstream
Length Surveyed
297.5 ft.
Total Length
297.5 ft.
Structural Index
3
Structural Quick
3O21
Structural Rating
237
O&M Index
2
O&M Quick
2W11
O&M Rating
237
Overall Index
2
Overall Quick
Overall Rating
474
Pipe schematic from manhole 01 0243 to 01 0276
MH: 01 0243MH: 01 0276upstream0 ft. JOM - Joint Offset Medium0 ft. MSA - Survey Abandoned - OFFSET0 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.8 ft. MMC - Material Change, Plastic/ steel composite29.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"31.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"70.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"72.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"114.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"119 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"141.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"157.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"163.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"195.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start195.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start202.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"208.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"250.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"252.3 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES295.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start295.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start297.4 ft. VC - Vermin Cockroach, within 8 inches of joint: YES297.5 ft. AMH - Downstream Manhole, Survey Begins - 01 0243297.5 ft. MWM - Water Mark, 40 %of cross sectional area297.5 ft. MWL - Water Level, 30 %of cross sectional area297.5 ft. MGO - General Observation - CONNECTION AT 3'0 IN MH297.5 ft. MGO - General Observation - REVERSAL

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

    45.2 ft. - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    102 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Plastic/ steel composite

    296.7 ft. - Material Change, Plastic/ steel composite

Observations (30)

DistanceCodeObservation
46.6TFC
0AMH01 0243
45.2CS
297.5JOM
265.8TFC
0.1VC
102CM
0MWM
156TF
268.2TFC
102CM
297.5MSAOFFSET
139.9TF
94.7TFC
297CM
296.7MMC
0MWL
226.8TFC
297.5DAE
89TF
297.5DAGS
2DAGS
183TF
225.4TF
297.5CM
0MGOCONNECTION AT 3'0 IN MH
0MGOREVERSAL
134TF
178.5TF
2.1DAE

Properties (6)

additional_info
SC378254
custom_field_two
5
customer
LACSD
datetime
2019-07-02T03:42:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false