Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 3, 2019, 07:33 AM
  • 05 2330_05 1472 _03072019_004622.mp4

Date
07/03/2019
W/O
771923
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00438
PipeID
P06696
Time
12:33 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5579
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_771923_TV05300_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 2330
Downstream MH
05 1472
Dir. of Survey
Downstream
Length Surveyed
261.1 ft.
Total Length
261.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 05 2330 to 05 1472
MH: 05 2330MH: 05 1472downstream0 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 23300 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"97.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4"183.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4"228.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4"258.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish261.1 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED261.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1472

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
258.7DAGS
0VC
0MWL
258.1SSS
261.1MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED
2SAP
97.1TF
183.1TF
0AMH05 2330
2SSS
258.3SAP
261.1AMH05 1472
6.1TFA
2DAGS
228.6TF
0MWM

Properties (6)

additional_info
SC378255
custom_field_two
3
customer
LACSD
datetime
2019-07-03T00:33:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false