Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 3, 2019, 08:28 AM
  • 05 1468_05 1467 _03072019_014140.mp4

Date
07/03/2019
W/O
771923
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00438
PipeID
P06690
Time
1:28 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5579
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_771923_TV05300_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1468
Downstream MH
05 1467
Dir. of Survey
Downstream
Length Surveyed
328.4 ft.
Total Length
328.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 05 1468 to 05 1467
MH: 05 1468MH: 05 1467downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14680 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED0 ft. MWM - Water Mark, 45 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"21.7 ft. VC - Vermin Cockroach65.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"113.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"165.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"174.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"216.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"265.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"317.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"325.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.4 ft. AMH - Downstream Manhole, Survey Ends - 05 1467328.4 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
113.7TFC
0AMH05 1468
165.3TFC
317.3TFC
2DAGS
21.7VC
2.1SSS
174.3TFC
328.4AMH05 1467
13.4TFC
216.9TFC
325.6SAP
2.1MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
328.4MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
325.6DAGS
325.6SSS
0MWL
2.1SAP
265.8TFC
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED
65.1TFC
0MWM

Properties (6)

additional_info
SC378255
custom_field_two
3
customer
LACSD
datetime
2019-07-03T01:28:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false