Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 3, 2019, 09:21 AM
  • 05 1466_05 1465 _03072019_023340.mp4

Date
07/03/2019
W/O
771923
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00438
PipeID
P06688
Time
2:21 AM
Certificate
U--209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5579
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_771923_TV05300_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1466
Downstream MH
05 1465
Dir. of Survey
Downstream
Length Surveyed
322.9 ft.
Total Length
322.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 05 1466 to 05 1465
MH: 05 1466MH: 05 1465downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 05 14660 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area1.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start1.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"62.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"122.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"161.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"170.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"222.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"274.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"320.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.8 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH322.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1465

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
1.8SSS
322.8MGOCONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH
21.6TFC
274.3TFC
320.7SAP
122.5TFC
320.7SSS
0AMH05 1466
0VC
1.6DAGS
0MWM
320.7DAGS
322.9AMH05 1465
0MWL
62.1TFC
161.6TFC
222.6TFC
170.7TFC
1.6SAP

Properties (6)

additional_info
SC378255
custom_field_two
3
customer
LACSD
datetime
2019-07-03T02:21:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false