Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2019, 06:04 AM
  • 15 0728_15 0727 _20062019_232615.mp4

Date
06/20/2019
W/O
771922
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00616
PipeID
P12621
Time
11:04 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6612
Sewer Name
15 MONROVIA OUTFALL TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
WO_771922_TV15131_JUN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
15 0728
Downstream MH
15 0727
Dir. of Survey
Downstream
Length Surveyed
454.4 ft.
Total Length
454.4 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 15 0728 to 15 0727
MH: 15 0728MH: 15 0727downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 07280 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - COCKROACHES AT MH2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start305.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS355.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start441 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish451.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish454.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish454.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0727454.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    355.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0AMH15 0728
454.4SAP
355.1SRV
0MWM
2SAP
0MWL
441SRV
0MGOCONNECTION AT MH 3 O'CLOCK
305.3DSZDEBRIS
0MGOCOCKROACHES AT MH
454.4AMH15 0727
2DAGS
451.2DSZ
454.4DAGS

Properties (6)

additional_info
SC378178
custom_field_two
2
customer
LACSD
datetime
2019-06-20T23:04:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false