Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 14, 2019, 07:31 AM
  • A 0325_A 0324 _14082019_005419.mp4

Date
08/14/2019
W/O
771794
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08235
Time
12:31 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6860
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_771794_TV15129_JUN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
A 0325
Downstream MH
A 0324
Dir. of Survey
Downstream
Length Surveyed
740.1 ft.
Total Length
740.1 ft.
Structural Index
3
Structural Quick
3\2\
Structural Rating
735
O&M Index
2
O&M Quick
412\
O&M Rating
298
Overall Index
2
Overall Quick
Overall Rating
1033
Pipe schematic from manhole A 0325 to A 0324
MH: A 0325MH: A 0324downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 03250 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start738.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish738.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish738.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish740.1 ft. AMH - Downstream Manhole, Survey Ends - A 0324

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHA 0325
0MWL
2DAGS
738.8DAGS
2SAP
0MWM
2SSS
738.8SSS
740.1AMHA 0324
738.8SAP

Properties (7)

additional_info
SC378330
custom_field_two
2
customer
LACSD
datetime
2019-08-14T00:31:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
29314