Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 12, 2019, 06:16 AM
  • 01 0545_01 0544_12072019_000119.mp4

Date
07/11/2019
W/O
771785
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00206
PipeID
P01033
Time
11:16 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6759
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_771785_TV01015_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0545
Downstream MH
01 0544
Dir. of Survey
Downstream
Length Surveyed
291.3 ft.
Total Length
291.3 ft.
Structural Index
2
Structural Quick
3J2J
Structural Rating
339
O&M Index
2
O&M Quick
2J11
O&M Rating
115
Overall Index
2
Overall Quick
Overall Rating
454
Pipe schematic from manhole 01 0545 to 01 0544
MH: 01 0545MH: 01 0544downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 01 05452 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.1 ft. CC - Crack Circumferential, from 08 to 05 o'clock, within 8 inches of joint: YES, Start49.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"52.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"72.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"75.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"96.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"98.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"110.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"124.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"148.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"151.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"175.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"177.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"198.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"201.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"224.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"227.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"250.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"253.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"267 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish267.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"279.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"287 ft. CC - Crack Circumferential, from 08 to 05 o'clock, within 8 inches of joint: YES, Finish287.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish289.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish291.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0544

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Circumferential, from 08 to 05 o'clock, within 8 inches of joint: YES, Start

    19.1 ft. - Crack Circumferential, from 08 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (33)

DistanceCodeObservation
151.3TFC
175.2TF
279.6TF
253.4TFC
96.1TF
19.1CC
2SSS
227.1TF
0MWL
267.7TF
198.6TFC
75.3TF
98.5TFA
52.2TF
148.7TFC
0MWM
2DAGS
224.5TF
177.8TF
289.1DAGS
201.1TFC
287CC
287.3CM
291.3AMH01 0544
110.4TF
250.7TF
0VC
267SSS
0AMH01 0545
49.3TFC
72.9TF
124.8TFC
4CM

Properties (6)

additional_info
SC378262
custom_field_two
3
customer
LACSD
datetime
2019-07-11T23:16:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false