Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 12, 2019, 07:03 AM
  • 01 0544_01 0543_12072019_002248.mp4

Date
07/12/2019
W/O
771785
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00206
PipeID
P01032
Time
12:03 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6759
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
WO_771785_TV01015_JUN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0544
Downstream MH
01 0543
Dir. of Survey
Downstream
Length Surveyed
280.4 ft.
Total Length
280.4 ft.
Structural Index
3
Structural Quick
423J
Structural Rating
178
O&M Index
2
O&M Quick
2J11
O&M Rating
111
Overall Index
3
Overall Quick
Overall Rating
289
Pipe schematic from manhole 01 0544 to 01 0543
MH: 01 0544MH: 01 0543downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 05440 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 30 %of cross sectional area2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"14.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"35.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"38 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"58.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"60.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"84.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"87 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"110.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"113.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"134 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"136.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"160.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"162.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"180.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"189 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"209.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"212.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"224.7 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4"236 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"238.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"257 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"259.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start262.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"264 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish264.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"266.2 ft. MMC - Material Change, Reinforced concrete pipe266.2 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start275 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES276.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish278.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish278.4 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish280.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0543

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    259.1 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Reinforced concrete pipe

    266.2 ft. - Material Change, Reinforced concrete pipe

  • Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    266.2 ft. - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

    275 ft. - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (39)

DistanceCodeObservation
160.3TF
266.2MMC
236TFC
180.6TF
58.4TFC
275FC
136.4TFA
264FM
209.8TFC
238.6TFC
278.4DAGS
262.6TF
35.3TF
0AMH01 0544
134TFC
224.7TB
278.4SAP
84.6TF
38TFA
2.7DAGS
0MWM
110.9TFC
212.1TF
12.3TF
264.9TFA
87TF
280.4AMH01 0543
259.1FM
4.6CM
60.8TFC
113.4TFC
276.6CM
14.5TFC
0VC
162.6TF
0MWL
189TFC
257TF
266.2SAP

Properties (6)

additional_info
SC378262
custom_field_two
3
customer
LACSD
datetime
2019-07-12T00:03:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false