Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 11, 2019, 04:54 AM
  • 19 0214_19 0213_10072019_222157.mp4

Date
07/10/2019
W/O
771933
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00718
PipeID
P15183
Time
9:54 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6705
Sewer Name
19 ARTESIA-CERRITOS TRUNK
City
ARTESIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_771933_TV19059_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
19 0214
Downstream MH
19 0213
Dir. of Survey
Downstream
Length Surveyed
269.1 ft.
Total Length
269.1 ft.
Structural Index
3
Structural Quick
423I
Structural Rating
164
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
314
Pipe schematic from manhole 19 0214 to 19 0213
MH: 19 0214MH: 19 0213downstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 19 02140 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH10.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish10.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.7 ft. FS - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES79.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"133 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start142.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.6 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES186.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"215.2 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES230 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish232.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish269.1 ft. AMH - Downstream Manhole, Survey Ends - 19 0213269.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish269.1 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH

Observation photos (5)

  • Upstream Manhole, Survey Begins - 19 0214

    0 ft. - Upstream Manhole, Survey Begins - 19 0214

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    49.7 ft. - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    185.6 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    215.2 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

Observations (26)

DistanceCodeObservation
133DAE
186.8TF
142.9TF
269.1AMH19 0213
79.6TF
266.5CM
0DAGS
185.6FM
232.6TFC
0MWM
109.2TF
19.6TFC
230DAE
269.1DAGS
0AMH19 0214
0DAE
90.2TF
0MWL
132.1TFC
269.1MGOCONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
49.7FS
197.4TF
215.2FM
10.1DAE
10.3CM

Properties (6)

additional_info
SC378204
custom_field_two
3
customer
LACSD
datetime
2019-07-10T21:54:19-07:00
documentation
PROPIPE
is_lateral_inspection
false