Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2019, 07:39 AM
  • 15 0095_15 0094 _28062019_013029.mp4

Date
06/28/2019
W/O
772001
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00633
PipeID
P12006
Time
12:39 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5582
Sewer Name
15 TURNBULL CANYON TRUNK
City
HACIENDA HEIGHTS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_772001_TV15238_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0095
Downstream MH
15 0094
Dir. of Survey
Downstream
Length Surveyed
358.2 ft.
Total Length
358.2 ft.
Structural Index
3
Structural Quick
3M24
Structural Rating
218
O&M Index
2
O&M Quick
312[
O&M Rating
288
Overall Index
2
Overall Quick
Overall Rating
506
Pipe schematic from manhole 15 0095 to 15 0094
MH: 15 0095MH: 15 0094downstream0 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 00950 ft. MWL - Water Level, 20 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4"75.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"77.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES101.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"103.2 ft. CS - Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES111.7 ft. CS - Crack Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES115.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS125.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 47"176.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"178.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"238.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"253.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"263.3 ft. CS - Crack Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES267.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES272.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"294.3 ft. CS - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES307.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"322.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"356 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish356.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish356.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish358.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0094

Observation photos (10)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    77.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

    103.2 ft. - Crack Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES

    111.7 ft. - Crack Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    115.2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

  • Crack Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES

    263.3 ft. - Crack Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    267.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

    294.3 ft. - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

Observations (30)

DistanceCodeObservation
176.2TF
2DAE
358.2AMH15 0094
2DAGS
322.3TF
75.3TFC
0MGOCONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH
101.9TFC
356.3DAE
0AMH15 0095
178.8TFC
356.4DAGS
115.2DSZDEBRIS
263.3CS
294.3CS
47.7TB
103.2CS
356CM
0MWL
238.6TF
272.5TFC
307.3TFC
0VC
125.4TFC
0MWM
267.4CM
253.4TFC
17CM
111.7CS
77.1CM

Properties (6)

additional_info
SC378252
custom_field_two
3
customer
LACSD
datetime
2019-06-28T00:39:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false