Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2019, 09:21 AM
  • 15 0084_15 0083_28062019_023926.mp4

Date
06/28/2019
W/O
772001
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00633
PipeID
P11997
Time
2:21 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5582
Sewer Name
15 TURNBULL CANYON TRUNK
City
HACIENDA HEIGHTS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_772001_TV15238_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0084
Downstream MH
15 0083
Dir. of Survey
Downstream
Length Surveyed
349.7 ft.
Total Length
349.7 ft.
Structural Index
3
Structural Quick
3M23
Structural Rating
210
O&M Index
2
O&M Quick
2[00
O&M Rating
278
Overall Index
2
Overall Quick
Overall Rating
488
Pipe schematic from manhole 15 0084 to 15 0083
MH: 15 0084MH: 15 0083downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 5 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 00840 ft. MWM - Water Mark, 45 %of cross sectional area2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start7.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start46 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"101.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"121 ft. CS - Crack Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES153.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"193 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: NO, 4" - TAP PROTRUDING NTO CHANNEL193.2 ft. CS - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES194 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"239.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"300.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"345 ft. CS - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES349 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish349.5 ft. MGO - General Observation - STOP LOG IN PLACE IN MH AT1'0349.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish349.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0083

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

    121 ft. - Crack Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    193.2 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    345 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
101.6TF
300.7TF
0MWL
349.5DAE
194TF
121CS
193.2CS
0MGOCONNECTIONS AT BOTH 3 AND 5 O' CLOCK AT MH
0AMH15 0084
239.9TF
349CM
0MWM
153.7TFC
345CS
349.5MGOSTOP LOG IN PLACE IN MH AT1'0
7.6CM
193TFDTAP PROTRUDING NTO CHANNEL
2.3DAGS
349.7AMH15 0083
46TFC
3DAE
349.5DAGS

Properties (6)

additional_info
SC378252
custom_field_two
3
customer
LACSD
datetime
2019-06-28T02:21:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false