Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 2, 2019, 07:40 PM
  • 15 0077_15 0076 _28062019_033012.mp4

Date
06/02/2019
W/O
772001
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00633
PipeID
P11989
Time
12:40 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5582
Sewer Name
15 TURNBULL CANYON TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_772001_TV15238_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0077
Downstream MH
15 0076
Dir. of Survey
Downstream
Length Surveyed
259.5 ft.
Total Length
259.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 15 0077 to 15 0076
MH: 15 0077MH: 15 0076downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 00770 ft. VC - Vermin Cockroach0 ft. MWL - Water Level, 15 %of cross sectional area3.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start3.2 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH6.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"105.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"152 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"193.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"253.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish257.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish259.5 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED259.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0076

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    3.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    3.2 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
257.3DAE
105.6TFC
3.2MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
6.7CM
257.3DAGS
259.5MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH CAPPED
193.5TFA
152TFC
3.1DAGS
253.3CM
0MWM
0AMH15 0077
0VC
0MWL
54.5TFC
3.1DAE
259.5AMH15 0076

Properties (6)

additional_info
SC378252
custom_field_two
3
customer
LACSD
datetime
2019-06-02T12:40:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false