Wastewater/Activity/PacpInspection/1.0Jun 4, 2019, 08:37 AM
  • 18 0746_18 0745 _06042019_015116.mp4

Date
06/04/2019
W/O
766508
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00706
PipeID
P14599
Time
1:37 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6558
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_766508_TV18103_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
18 0746
Downstream MH
18 0745
Dir. of Survey
Downstream
Length Surveyed
332.7 ft.
Total Length
332.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 18 0746 to 18 0745
MH: 18 0746MH: 18 0745downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07462.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start45 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start332.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish332.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0745332.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish332.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    45 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
332.7SSS
332.7AMH18 0745
2.3SSS
45SAP
0MWL
2.3MGOMAG COAT THROUGHOUT PIPE
0AMH18 0746
332.7DAGS
2.3DAGS
332.7SAP

Properties (6)

additional_info
SC377680
custom_field_two
3
customer
LACSD
datetime
2019-06-04T01:37:32-07:00
documentation
PROPIPE
is_lateral_inspection
false