Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2019, 09:37 AM
  • 18 0731_18 0730 _06062019_024336.mp4

Date
06/06/2019
W/O
766508
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00706
PipeID
P14584
Time
2:37 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6560
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_766508_TV18103_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0731
Downstream MH
18 0730
Dir. of Survey
Downstream
Length Surveyed
66.1 ft.
Total Length
66.1 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
36
O&M Index
2
O&M Quick
2A00
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
60
Pipe schematic from manhole 18 0731 to 18 0730
MH: 18 0731MH: 18 0730downstream0 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07316.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start64.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish64.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish66.1 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK CAPPED66.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0730

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    6.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
66.1MGOCONNECTION IN MH 3 OCLOCK CAPPED
6.2DAGS
0MGOCONNECTION IN MH 3 OCLOCK
0MWL
64.9SAP
6.7SAP
0MWM
64.9DAGS
66.1AMH18 0730
0AMH18 0731

Properties (6)

additional_info
SC377683
custom_field_two
3
customer
LACSD
datetime
2019-06-06T02:37:27-07:00
documentation
PROPIPE
is_lateral_inspection
false