08 0172_08 0171_03072019_034100.mp4

0 ft. - Upstream Manhole, Survey Begins - 08 0172
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
33.5 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES
33.7 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
110.9 ft. - Crack Spiral, from 08 to 04 o'clock, within 8 inches of joint: YES
211.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
245.2 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES
292.8 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
298.1 ft. - Crack Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 33.7 | CS | — |
| 2 | DAGS | — |
| 187 | TF | — |
| 0 | AMH | 08 0172 |
| 298.1 | CS | — |
| 317.5 | TFA | — |
| 2 | DAE | — |
| 292.8 | CS | — |
| 0 | MWM | — |
| 0 | VC | — |
| 331.1 | DAGS | — |
| 0 | MGO | CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH |
| 33.5 | CL | — |
| 110.9 | CS | — |
| 100.1 | TF | — |
| 139.1 | TF | — |
| 274.9 | TF | — |
| 223.9 | TF | — |
| 72.8 | TF | — |
| 331.1 | DAE | — |
| 211.6 | CM | — |
| 333.3 | AMH | 08 0171 |
| 245.2 | CL | — |