Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2016, 07:42 AM
  • 14 0535A_14 0535_02032016_234245.mp4

Date
03/02/2016
W/O
552346
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18625
Time
11:42 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3274
Sewer Name
14 35TH STREET WEST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
WO_552346_TV14042_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
14 0535A
Downstream MH
14 0535
Dir. of Survey
Downstream
Length Surveyed
85.9 ft.
Total Length
85.9 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
78
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
82
Pipe schematic from manhole 14 0535A to 14 0535
MH: 14 0535AMH: 14 0535downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 0535A2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start83.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish83.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish83.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish85.9 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK85.9 ft. AMH - Downstream Manhole, Survey Ends - 14 053585.9 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2.5SAV
0MWM
83.6DAGS
85.9MGOCAPPED CONNECTION AT MH 3 O'CLOCK
83.6SAV
2DAGS
85.9AMH14 0535
85.9MGOCAPPED CONNECTION AT MH 9 O'CLOCK
0MWL
83.6SSS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
6.7SSS
0AMH14 0535A

Properties (6)

additional_info
SC225498
custom_field_two
3
customer
LACSD
datetime
2016-03-02T23:42:29-08:00
documentation
PRO PIPE
is_lateral_inspection
false