14 0537_14 0536_02032016_225727.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
129.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
233.2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR
273.4 ft. - Roots Fine Joint, from 10 to 04 o'clock, within 8 inches of joint: YESR
321.7 ft. - Roots Fine Joint, from 09 to 12 o'clock, within 8 inches of joint: YESR
329.3 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start
| Distance | Code | Observation |
|---|---|---|
| 233.2 | RFJ | — |
| 450.8 | DAGS | — |
| 273.4 | RFJ | — |
| 452.8 | AMH | 14 0536 |
| 2 | MGO | MAG COATING 90% |
| 329.3 | RFJ | — |
| 450.8 | SSS | — |
| 0 | MWM | — |
| 129.8 | SSS | — |
| 321.7 | RFJ | — |
| 446.5 | RFJ | — |
| 2 | DAGS | — |
| 0 | MWL | — |
| 0 | AMH | 14 0537 |