Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2016, 11:33 AM
  • 14 0546_14 0545_01032016_033334.mp4

Date
03/01/2016
W/O
552346
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18637
Time
3:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3272
Sewer Name
14 35TH STREET WEST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
14
Purpose
Routine Assessment
Project
WO_552346_TV14042_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
14 0545
Downstream MH
14 0546
Dir. of Survey
Upstream
Length Surveyed
315.7 ft.
Total Length
315.7 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
186
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
314
Pipe schematic from manhole 14 0545 to 14 0546
MH: 14 0545MH: 14 0546upstream0 ft. AMH - Upstream Manhole, Survey Ends - 14 05463.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish34 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, from 05 to 07 o'clock, Finish43.5 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, from 05 to 07 o'clock, Start313.7 ft. MGO - General Observation - MAG COATING 90%313.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start315.7 ft. AMH - Downstream Manhole, Survey Begins - 14 0545315.7 ft. MWM - Water Mark, 25 %of cross sectional area315.7 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Obstacles Rocks, 10 %of cross sectional area, from 05 to 07 o'clock, Start

    272.2 ft. - Obstacles Rocks, 10 %of cross sectional area, from 05 to 07 o'clock, Start

Observations (9)

DistanceCodeObservation
312DAGS
0AMH14 0545
0MWM
2MGOMAG COATING 90%
272.2OBR
0MWL
315.7AMH14 0546
281.7OBR
2DAGS

Properties (6)

additional_info
SC225496
custom_field_two
5
customer
LACSD
datetime
2016-03-01T03:33:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false