Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2016, 10:10 AM
  • 14 0546A_14 0546_01032016_021053.mp4

Date
03/01/2016
W/O
552346
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18638
Time
2:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3272
Sewer Name
14 35TH STREET WEST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
14
Purpose
Routine Assessment
Project
WO_552346_TV14042_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
14 0546A
Downstream MH
14 0546
Dir. of Survey
Downstream
Length Surveyed
199.2 ft.
Total Length
199.2 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
117
O&M Index
2
O&M Quick
2G00
O&M Rating
78
Overall Index
3
Overall Quick
Overall Rating
195
Pipe schematic from manhole 14 0546A to 14 0546
MH: 14 0546AMH: 14 0546downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0546A0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 04 to 08 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING 80%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start196.8 ft. SAV - Surface Aggregate Visible, from 04 to 08 o'clock, within 8 inches of joint: YES, Finish196.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish199.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0546

Observation photos (2)

  • Surface Aggregate Visible, from 04 to 08 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 04 to 08 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
2SAV
196.8SAV
2MGOMAG COATING 80%
0AMH14 0546A
2DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
199.2AMH14 0546
196.8DAGS
0MWL

Properties (6)

additional_info
SC225496
custom_field_two
3
customer
LACSD
datetime
2016-03-01T02:10:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false