Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2016, 09:45 AM
  • B 0512_B 0511_20160219_014435.mp4

Date
02/19/2016
W/O
552342
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00099
PipeID
P09059
Time
1:45 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3153
Sewer Name
B JOINT OUTFALL B - UNIT 6E
City
ROSEMEAD, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
27
Purpose
Routine Assessment
Project
WO_552342_TV15111_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
B 0512
Downstream MH
B 0511
Dir. of Survey
Downstream
Length Surveyed
187.8 ft.
Total Length
187.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2F12
O&M Rating
72
Overall Index
2
Overall Quick
Overall Rating
72
Pipe schematic from manhole B 0512 to B 0511
MH: B 0512MH: B 0511downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 05120 ft. MWL - Water Level, 25 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAGNESIUM H.O. START6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start181.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish187.8 ft. VC - Vermin Cockroach187.8 ft. AMH - Downstream Manhole, Survey Ends - B 0511

Observation photos (3)

  • General Observation - MAGNESIUM H.O. START

    2 ft. - General Observation - MAGNESIUM H.O. START

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    181.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (9)

DistanceCodeObservation
0AMHB 0512
0MWL
187.8VC
181.4DAGS
6DAGS
0VC
0MWM
187.8AMHB 0511
2MGOMAGNESIUM H.O. START

Properties (6)

additional_info
SC225540
custom_field_two
4
customer
LACSD
datetime
2016-02-19T01:45:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false