Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2016, 11:42 AM
  • G 0131_G 0130_20160107_034600.mp4

Date
01/07/2016
W/O
547460
Weather
Light Rain
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01180
PipeID
P25036
Time
3:42 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3108
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
WO_547460_TV01004_JAN2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
36 in.
Upstream MH
G 0131
Downstream MH
G 0130
Dir. of Survey
Downstream
Length Surveyed
37.1 ft.
Total Length
37.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4126
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole G 0131 to G 0130
MH: G 0131MH: G 0130downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - G 01310.2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - GASES RESIDUE0.2 ft. MWM - Water Mark, 60 %of cross sectional area31.8 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish36.9 ft. MGO - General Observation - CONNECTION AT MANHOLE ACTIVE 9 O'CLOCK37.1 ft. AMH - Downstream Manhole, Survey Ends - G 0130

Observation photos (1)

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Finish

    31.8 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish

Observations (7)

DistanceCodeObservation
0.2DAZGASES RESIDUE
0.2MWM
31.8DAZ
0MWL
36.9MGOCONNECTION AT MANHOLE ACTIVE 9 O'CLOCK
0AMHG 0131
37.1AMHG 0130

Properties (7)

additional_info
SC224489
custom_field_two
4
customer
LACSD
datetime
2016-01-07T03:42:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false
year_laid
20040209