Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2016, 10:39 AM
  • G 0212_G 0211_20160111_025942.mp4

Date
01/11/2016
W/O
547459
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01180
PipeID
P01116
Time
2:39 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3111
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
SOUTH GATE, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_547459_TV01053_JAN2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
G 0212
Downstream MH
G 0211
Dir. of Survey
Downstream
Length Surveyed
337.9 ft.
Total Length
337.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole G 0212 to G 0211
MH: G 0212MH: G 0211downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - G 02120 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start52.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES66.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"116 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"167.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"335.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish337.9 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK337.9 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK337.9 ft. AMH - Downstream Manhole, Survey Ends - G 0211

Observation photos (3)

  • Water Mark, 50 %of cross sectional area

    0 ft. - Water Mark, 50 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    52.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
337.9MGOCONNECTION AT MH 9 OCLOCK
216TFC
0MWM
308.8TFC
337.9MGOCONNECTION AT MH 3 OCLOCK
0MWL
7DAGS
335.3DAGS
167.3TFC
52.3FL
66.8TF
337.9AMHG 0211
116TFC
0AMHG 0212
0MGOCONNECTION AT MH 9 OCLOCK
265.2TFC

Properties (6)

additional_info
SC224492
custom_field_two
4
customer
LACSD
datetime
2016-01-11T02:39:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false