Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2016, 08:15 AM
  • G 0202_G 0201_20160112_002700.mp4

Date
01/12/2016
W/O
547459
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01180
PipeID
P01107
Time
12:15 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3112
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
SOUTH GATE, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_547459_TV01053_JAN2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Upstream MH
G 0202
Downstream MH
G 0201
Dir. of Survey
Downstream
Length Surveyed
134.1 ft.
Total Length
134.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole G 0202 to G 0201
MH: G 0202MH: G 0201downstream0 ft. AMH - Upstream Manhole, Survey Begins - g 02020 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0 ft. MWL - Water Level, 40 %of cross sectional area42.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start80 ft. FS - Fracture Spiral, from 07 to 12 o'clock, within 8 inches of joint: YES126.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish134.1 ft. AMH - Downstream Manhole, Survey Ends - G 0201

Observation photos (2)

  • Deposits Attached Grease, 20 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: NO

    0 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO

  • Fracture Spiral, from 07 to 12 o'clock, within 8 inches of joint: YES

    80 ft. - Fracture Spiral, from 07 to 12 o'clock, within 8 inches of joint: YES

Observations (9)

DistanceCodeObservation
126.6DAGS
0AMHg 0202
0MWM
134.1AMHG 0201
0DAGS
80FS
0MGOCONNECTION AT MH 3 OCLOCK
0MWL
42.1DAGS

Properties (6)

additional_info
SC224493
custom_field_two
4
customer
LACSD
datetime
2016-01-12T00:15:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false