Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2016, 06:50 AM
  • B 0324_B 0323_20160204_224904.mp4

Date
02/04/2016
W/O
552357
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00089
PipeID
P08849
Time
10:50 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3136
Sewer Name
B JOINT OUTFALL B - UNIT 4A
City
ROSEMEAD, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_552357_TV15106_FEB2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 0324
Downstream MH
B 0323
Dir. of Survey
Downstream
Length Surveyed
331.3 ft.
Total Length
331.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L11
O&M Rating
131
Overall Index
2
Overall Quick
Overall Rating
131
Pipe schematic from manhole B 0324 to B 0323
MH: B 0324MH: B 0323downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 03240 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0.1 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK2 ft. MGO - General Observation - MAGNESIUM H.O. START3.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.5 ft. VC - Vermin Cockroach326.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish331.2 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK331.3 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK331.3 ft. AMH - Downstream Manhole, Survey Ends - B 0323

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    326.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
0AMHB 0324
0MWL
0MWM
326.4DAGS
331.3MGOLATERAL AT MH 9 OCLOCK
0.1MGOLATERAL AT MH 9 OCLOCK
3.4DAGS
331.2MGOLATERAL AT MH 3 OCLOCK
331.3AMHB 0323
3.5VC
2MGOMAGNESIUM H.O. START

Properties (6)

additional_info
SC225523
custom_field_two
4
customer
LACSD
datetime
2016-02-04T22:50:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false