Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2019, 08:41 AM
  • 19_1_1_13052019_015451.mp4

Date
05/13/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12266
Time
1:41 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6525
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
15 0340
Downstream MH
15 0339
Dir. of Survey
Downstream
Length Surveyed
434 ft.
Total Length
434 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
430
O&M Index
2
O&M Quick
2P00
O&M Rating
172
Overall Index
2
Overall Quick
Overall Rating
602
Pipe schematic from manhole 15 0340 to 15 0339
MH: 15 0340MH: 15 0339downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03400 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start101.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"188.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"298.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"348.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"398.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"432.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish432.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish432.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish434 ft. AMH - Downstream Manhole, Survey Ends - 15 0339434 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    434 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
298.5TFC
169.9TFC
432.1SSS
2DAGS
398.4TFC
101.1TFC
188.7TFC
2SAP
0MWM
2SSS
432.1DAGS
434AMH15 0339
432.1SAP
0AMH15 0340
230TFA
348.4TFA
0MWL
434MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC366245
custom_field_two
2
customer
LACSD
datetime
2019-05-13T01:41:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false