Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2019, 08:30 AM
  • 20_1_1_13052019_014034.mp4

Date
05/13/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12267
Time
1:30 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6525
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
15 1186
Downstream MH
15 0340
Dir. of Survey
Downstream
Length Surveyed
214.2 ft.
Total Length
214.2 ft.
Structural Index
3
Structural Quick
3G22
Structural Rating
130
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
138
Pipe schematic from manhole 15 1186 to 15 0340
MH: 15 1186MH: 15 0340downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 11862 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"78.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"128 ft. MGO - General Observation - UNKNOWN CONN. @ 02 O'CLOCK170.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"212 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish212 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish212 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish214.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0340

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
212DAGS
78.3TFA
2SAP
212SSS
30.4TFC
128MGOUNKNOWN CONN. @ 02 O'CLOCK
0MWL
0MWM
214.2AMH15 0340
170.8TFA
212SAP
2DAGS
2SSS
0AMH15 1186

Properties (6)

additional_info
SC366245
custom_field_two
2
customer
LACSD
datetime
2019-05-13T01:30:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false