Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2019, 09:21 AM
  • 7_1_1_03052019_023659.mp4

Date
05/03/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12253
Time
2:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6522
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0327
Downstream MH
15 0326
Dir. of Survey
Downstream
Length Surveyed
426.8 ft.
Total Length
426.8 ft.
Structural Index
3
Structural Quick
3P22
Structural Rating
259
O&M Index
3
O&M Quick
413P
O&M Rating
429
Overall Index
3
Overall Quick
Overall Rating
688
Pipe schematic from manhole 15 0327 to 15 0326
MH: 15 0327MH: 15 0326downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03270 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT FROM 08 TO 04 O'CLOCK, START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS11.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"19.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"211.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"315.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"403.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"412.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"424 ft. MGO - General Observation - 30% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH425 ft. MGO - General Observation - COCKROACHES IN MANHOLE425 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish425 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish425 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish425 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish426.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0326

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • General Observation - COCKROACHES IN MANHOLE

    425 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (26)

DistanceCodeObservation
219.8TFC
412.5TFC
11.5TFC
0AMH15 0327
0MWM
426.8AMH15 0326
308.1TFC
425MGOCOCKROACHES IN MANHOLE
2SAP
403.7TFC
425SSS
315.8TFC
2DAGS
2MGO30% MAG COAT FROM 08 TO 04 O'CLOCK, START
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SSS
0MWL
0MGOCOCKROACHES IN MANHOLE
115.8TFC
424MGO30% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
425DAGS
2DSZDEBRIS
211.7TFC
425SAP
19.5TFC
425DSZ

Properties (6)

additional_info
SC366242
custom_field_two
3
customer
LACSD
datetime
2019-05-03T02:21:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false