Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2019, 05:54 AM
  • 4_1_1_06052019_230616.mp4

Date
05/06/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12250
Time
10:54 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6524
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
15 0324
Downstream MH
15 0323
Dir. of Survey
Downstream
Length Surveyed
50.1 ft.
Total Length
50.1 ft.
Structural Index
3
Structural Quick
3929
Structural Rating
45
O&M Index
2
O&M Quick
4129
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
67
Pipe schematic from manhole 15 0324 to 15 0323
MH: 15 0324MH: 15 0323downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03240 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT FROM 08 TO 04 O'CLOCK, START10.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish46.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish46.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish49 ft. MGO - General Observation - 70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH50.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE50.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0323

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    50.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
0MWM
2DAGS
0AMH15 0324
10.2TFC
2SSS
2SAP
50.1MGOCOCKROACHES IN MANHOLE
0MGOCOCKROACHES IN MANHOLE
46.6SAP
49MGO70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
2MGO70% MAG COAT FROM 08 TO 04 O'CLOCK, START
46.6DAGS
46.6SSS
0MWL
50.1AMH15 0323

Properties (6)

additional_info
SC366244
custom_field_two
2
customer
LACSD
datetime
2019-05-06T22:54:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false