Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2019, 08:47 AM
  • 9_1_1_03052019_015940.mp4

Date
05/03/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12255
Time
1:47 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6522
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0329
Downstream MH
15 0328
Dir. of Survey
Downstream
Length Surveyed
402.6 ft.
Total Length
402.6 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 15 0329 to 15 0328
MH: 15 0329MH: 15 0328downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03292 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40% MAG COAT FROM 09 TO 03 O'CLOCK, START2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start43.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"340.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"348.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"401 ft. MGO - General Observation - 40% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH401.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish401.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish401.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish402.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0328

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
252.4TFC
0MWL
401.3SSS
0MWM
2SSS
401.3SAP
401MGO40% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
43.6TFC
348.3TFC
0AMH15 0329
148.7TFC
2MGO40% MAG COAT FROM 09 TO 03 O'CLOCK, START
402.6AMH15 0328
2SAP
51.9TBA
140.1TBA
340.8TFC
401.3DAGS
2DAGS
244.2TFC

Properties (6)

additional_info
SC366242
custom_field_two
3
customer
LACSD
datetime
2019-05-03T01:47:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false