Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2019, 08:10 AM
  • 5_1_1_07052019_011908.mp4

Date
05/07/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12251
Time
1:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6524
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0325
Downstream MH
15 0324
Dir. of Survey
Downstream
Length Surveyed
192.4 ft.
Total Length
192.4 ft.
Structural Index
3
Structural Quick
3G22
Structural Rating
118
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
126
Pipe schematic from manhole 15 0325 to 15 0324
MH: 15 0325MH: 15 0324downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03250 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MGO - General Observation - 60% MAG COAT FROM 08 TO 04 O'CLOCK, START2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start121.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"190 ft. MGO - General Observation - 60% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH190.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish190.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish190.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE190.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish192.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0324

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    190.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
190.7SSS
0MWL
0AMH15 0325
190.7DAGS
2MGO60% MAG COAT FROM 08 TO 04 O'CLOCK, START
0MGOCOCKROACHES IN MANHOLE
192.4AMH15 0324
190.7MGOCOCKROACHES IN MANHOLE
0MWM
2DAGS
2SAP
2SSS
190.7SAP
121.4TFC
190MGO60% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH

Properties (6)

additional_info
SC366244
custom_field_two
2
customer
LACSD
datetime
2019-05-07T01:10:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false