Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2019, 10:44 AM
  • 11_1_1_13052019_035633.mp4

Date
05/13/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12257
Time
3:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6525
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0331
Downstream MH
15 0330
Dir. of Survey
Downstream
Length Surveyed
186.8 ft.
Total Length
186.8 ft.
Structural Index
2
Structural Quick
3F2F
Structural Rating
179
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
187
Pipe schematic from manhole 15 0331 to 15 0330
MH: 15 0331MH: 15 0330downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03310 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START10.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start52.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"157.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185 ft. MGO - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH185.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK185.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE185.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish185.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish185.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish186.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0330

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    185.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
185.3MGOACTIVE CONNECTION AT MH 9 O'CLOCK
52.7TBA
185.3MGOCOCKROACHES IN MANHOLE
0AMH15 0331
185.3DAGS
2SSS
0MWL
2DAGS
10.7SAP
148.2TFC
185MGO50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
185.3SSS
60.1TFC
186.8AMH15 0330
0MWM
157.8TFC
2MGO50% MAG COAT FROM 09 TO 03 O'CLOCK, START
185.3SAP

Properties (6)

additional_info
SC366245
custom_field_two
2
customer
LACSD
datetime
2019-05-13T03:44:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false