Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2019, 08:59 AM
  • 8_1_1_03052019_022046.mp4

Date
05/03/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12254
Time
1:59 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6522
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0328
Downstream MH
15 0327
Dir. of Survey
Downstream
Length Surveyed
426.5 ft.
Total Length
426.5 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
420
O&M Index
2
O&M Quick
4124
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
432
Pipe schematic from manhole 15 0328 to 15 0327
MH: 15 0328MH: 15 0327downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03280 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT FROM 08 TO 04 O'CLOCK, START37 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"44.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"136.1 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"141 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"244.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"316.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS340.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"349.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"424 ft. MGO - General Observation - 65% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH424.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish424.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish424.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK424.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE424.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish424.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish426.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0327

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    424.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (26)

DistanceCodeObservation
141TFC
424.2DAGS
424MGO65% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
136.1TBA
424.2DSZ
349.1TFC
0AMH15 0328
316.8DSZDEBRIS
2SSS
2DAGS
37TFC
0MWL
426.5AMH15 0327
2SAP
172TF
44.5TFC
424.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
424.2MGOCOCKROACHES IN MANHOLE
340.7TFC
424.2SSS
0MWM
244.5TFC
2MGO65% MAG COAT FROM 08 TO 04 O'CLOCK, START
148.1TFC
424.2SAP
237.1TFC

Properties (6)

additional_info
SC366242
custom_field_two
3
customer
LACSD
datetime
2019-05-03T01:59:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false