Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2019, 06:22 AM
  • 2_1_1_06052019_233733.mp4

Date
05/06/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12248
Time
11:22 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6524
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
15 0322
Downstream MH
15 0321
Dir. of Survey
Downstream
Length Surveyed
454 ft.
Total Length
454 ft.
Structural Index
2
Structural Quick
322Q
Structural Rating
186
O&M Index
2
O&M Quick
412b
O&M Rating
350
Overall Index
2
Overall Quick
Overall Rating
536
Pipe schematic from manhole 15 0322 to 15 0321
MH: 15 0322MH: 15 0321downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03220 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MGO - General Observation - 45% MAG COAT FROM 08 TO 04 O'CLOCK, START2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start20.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"37.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS180 ft. MGO - General Observation - 70% MAG COAT FROM 08 TO 04 O'CLOCK, CHANGE221.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"326.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"422.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"452 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish452 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish452 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish452 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish453 ft. MGO - General Observation - 70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH454 ft. AMH - Downstream Manhole, Survey Ends - 15 0321454 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    454 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
454AMH15 0321
0AMH15 0322
452SAP
37.1DSZDEBRIS
2MGO45% MAG COAT FROM 08 TO 04 O'CLOCK, START
452DSZ
2DAGS
180MGO70% MAG COAT FROM 08 TO 04 O'CLOCK, CHANGE
221.9TFC
2SSS
20.7TFC
452DAGS
0MGOCOCKROACHES IN MANHOLE
453MGO70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
422.9TFC
2SAP
454MGOCOCKROACHES IN MANHOLE
452SSS
0MWL
326.9TBA
0MWM

Properties (6)

additional_info
SC366244
custom_field_two
2
customer
LACSD
datetime
2019-05-06T23:22:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false