Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2019, 06:07 AM
  • 3_1_1_06052019_232112.mp4

Date
05/06/2019
W/O
761820
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12249
Time
11:07 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6524
Sewer Name
15 BALDWIN PARK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_761820_TV15019_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
15 0323
Downstream MH
15 0322
Dir. of Survey
Downstream
Length Surveyed
452.2 ft.
Total Length
452.2 ft.
Structural Index
2
Structural Quick
322Q
Structural Rating
186
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
194
Pipe schematic from manhole 15 0323 to 15 0322
MH: 15 0323MH: 15 0322downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03230 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area2 ft. MGO - General Observation - 45% MAG COAT FROM 08 TO 04 O'CLOCK, START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"373 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - UNKNOWN449.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish449.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish449.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish451 ft. MGO - General Observation - COCKROACHES IN MANHOLE451 ft. MGO - General Observation - 70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH452.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0322

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0AMH15 0323
2MGO45% MAG COAT FROM 08 TO 04 O'CLOCK, START
2SSS
75.8TFC
0MGOCOCKROACHES IN MANHOLE
449.6SSS
452.2AMH15 0322
449.6DAGS
0MWM
449.6SAP
373TFUNKNOWN
2SAP
172.6TFC
0MWL
451MGOCOCKROACHES IN MANHOLE
451MGO70% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
2DAGS

Properties (6)

additional_info
SC366244
custom_field_two
2
customer
LACSD
datetime
2019-05-06T23:07:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false